Sale!

Smiths Medical Level 1 400 Series Esophageal Stethoscope 9 fr, Thermistor, Temperature Sensor, Heat Bonded Cuff, Long Lead Wires, Insulated Sensor Cap – ES400-9

Original price was: £109.50.Current price is: £22.82.

SKU: ivsjlfjw07004 Category:

Description

This item requires 3-5 Business Days to process and prepare for shipping.
  • Smiths Medical Level 1 disposable Esophageal Stethoscope Temperature Sensors are placed into the esophagus to provide accurate measurement of a patients core body temperature and transmit heart and lung sounds to the anesthesiologists earpiece
  • Exceptional sound quality
  • Smooth, heat-bonded cuff to tube transition minimizes potential for esophageal irritation
  • Long lead wires ensure that the connection to cable is away from patients face
  • Insulated sensor cap decreases risk of patient shock or burn during electrocautery, available in adult and pediatric sizes
  • WARNING: Cancer and Reproductive Harm – www.P65Warnings.ca.gov

Stock # : 171435Manufacturer # : ES400-9Brand : Level 1 400 SeriesManufacturer : Smiths MedicalApplication : Esophageal StethoscopeSpecifications : 9 fr, Thermistor, Temperature Sensor, Heat Bonded Cuff, Long Lead Wires, Insulated Sensor CapUNSPSC Code : 42182209

Additional information

Packaging

Box of 20

Reviews

There are no reviews yet.

Be the first to review “Smiths Medical Level 1 400 Series Esophageal Stethoscope 9 fr, Thermistor, Temperature Sensor, Heat Bonded Cuff, Long Lead Wires, Insulated Sensor Cap – ES400-9”

Your email address will not be published. Required fields are marked *